Finlay.worksBareBones Validation manual

BareBones Validation has one route through a validation. The steps, their order and the ways a step can go wrong are fixed by the product; there is no workflow to design. This page shows the whole route. Each later page of Use explains one box.

The straight line

The route of a validation in BareBones ValidationNineteen steps in order from registering the product to checking the package offline, with the side paths for a failed step and for a correction after finalization. The table below the chart lists every step and path in words.ONCE FOR THE PRODUCT1. Register the productA person with the setup permissionsEACH RELEASE2. Record the release candidateA person with the setup permissions3. Bring in and review the requirement documentsA person with the setup permissions4. Write the protocolAn author: requirements, scripts, trace, registration5. Publish the protocolApprover6. Record the validation approachAn author writes. Approver accepts.7. Load and accept the protocolApprover8. Execute every stepExecutor: a person or the AI operatorDid every step pass?A. A step failed or was blockedThe product opens a deviation.A person says what happenedand decides. A retest run canrepeat the step. An approversigns or approves the decision.The run carries on at step 9.NoYes9. Finalize each runExecutor proposes and approves.10. Include the evidenceApprover, item by item11. Review the run and every resultApproverC. A finalized step needs correctingAn approver authorizes thecorrection. The first resultstays readable.12. Give a reason for each untested requirementProposed, then accepted by an Approver.13. Generate the validation packageA person or the AI operator14. Close each validation recordProposed, then closed by an Approver.closed with its approved deviation15. Record the program gate decisionApprover16. Generate the package againA person or the AI operator17. Designate the packageApprover18. Build the bundle, record the hand-offA person19. Check the package offlineAnyone holding the packageAt every box where a person approves, three more things can happen:E. the record changed, so the page offers "Propose again";F. the person may approve but not sign, so the decision waits for a signer;G. the installation is read-only without a valid licence, so the change is refused.

Read the chart from the top. A solid arrow is the next step. A box at the side is a path a validation can take; it shows where it leaves and where it returns.

Every box where an Approver acts is an approval point. Your approval policy says, for each point, whether the approver signs electronically or records a plain approval. Either way a person reads the exact record and acts in the product.

The AI operator works under a service or tool account. It performs the validation administration and the execution capture: it registers, records, executes, attaches evidence, proposes and generates. It cannot approve or sign. People review, decide and sign. See What the AI Does.

The steps, one by one

"Setup permissions" are the permissions granted to a person directly. They are listed in Roles and Permissions, and Permissions says which ones each step needs. A page you may not use tells you which one it needs.

Step Who Page Approval point Can branch here
1. Register the product A person with the setup permissions Validation › Register a product none none
2. Record the release candidate A person with the setup permissions Validation › Record a release candidate none A later candidate can replace an earlier one
3. Bring in and review the requirement documents A person with the setup permissions Validation › Requirement sources › Bring in requirement documents, then Review the requirements and save the extract none Parse problems are listed in the preview before anything is saved
4. Write the protocol An author Candidate page › Start a protocol draft: Requirements, Scripts, Trace, Registration, then Submit protocol none D: a registered protocol that needs correcting
5. Publish the protocol Approver Open publication review Template publication D: withdraw the publication request. E, F
6. Record the validation approach An author writes; Approver decides Candidate page › Validation approach Validation approach Return for changes, or Reject. E, F
7. Load and accept the protocol Approver Worksheet › Load this protocol, then Accept protocol and trace for testing Protocol acceptance Return for changes, or Reject. E, F
8. Execute Executor Worksheet › Start the run, then each step's row none A: a failed or blocked step. B: a correction before finalization
9. Finalize each run Executor proposes and approves Worksheet › Finalize the run… Run finalization C: a correction after finalization. E, F
10. Include the evidence Approver Evidence review Evidence inclusion E, F
11. Review Approver Run page › Prepare review Exact version review Request correction, or Reject. A corrected record returns here
12. Reasons for untested requirements A person or the AI operator proposes; Approver decides Coverage › Recorded reasons Requirement coverage Skipped when every requirement has a test. E, F
13. Generate the validation package A person or the AI operator with the permissions for it Candidate page › Generate the validation package, or Read a draft first none Generating prepares the validation records. This first package shows them open
14. Close each validation record A person or the AI operator proposes; Approver decides Validation record page › Approve passing record Canonical clean pass After A: Close record with approved deviation
15. Program gate Approver Candidate page › Record a gate decision Program gate Accepted or Rejected. After a rejection the corrections go in a new candidate
16. Generate the package again A person or the AI operator with the permissions for it Candidate page › Generate a new package none The package now shows the closed records and the gate decision
17. Designate the package Approver Package page › Designate this package current Package designation Refused while a validation record is open. A later package replaces an earlier one
18. Bundle and hand-off A person Package page › Build version bundle, Record hand-off none A hand-off that names the wrong file is refused
19. Check offline Anyone Outside the product none none

Step 1 is done once. Steps 3 to 5 are done when there is no published protocol for the release, or when the requirements or the protocol change; a release tested against a protocol that is already published goes from step 2 to step 6. Step 6 is done once and again when a release changes what is tested and why.

The candidate page names the next step at each point. After step 13 it leads through steps 14 to 17 in this order, so that the package you designate shows every record closed and the gate decision.

The paths off the straight line

Each path leaves at one step and returns at one step.

Path Leaves at What happens Returns at
A. A step fails or is blocked 8 The product opens a deviation on the step. A person records what happened and what it affected, then decides: Needs correction, Accept with remaining risk, or Reject. The retest choice is Retest planned, No retest needed, or, after a retest run, Retest completed. Open a retest run repeats the step in a run of its own. The approval point is Deviation disposition. 9, and at 14 the record closes with its approved deviation
B. A step is corrected before the run is finalized 8 The executor saves the step again. Nothing is locked until the run is finalized. 8
C. A step is corrected after the run is finalized 9 A finalized run refuses direct edits. An approver authorizes a correction (approval point Amendment). The first result and every earlier approval stay readable at their version. 11: the corrected record is reviewed again
D. A registered protocol needs correcting 4 or 5 Create revised protocol starts a new draft from the registered one. A publication request that should not be decided is withdrawn with a reason. 4
E. A proposal can no longer be approved any approval The record changed after the proposal was made. Its page says so and offers Propose again. A proposal that was already decided leads to its recorded decision. the same approval
F. A person may approve but not sign any approval that needs a signature The page tells them the decision waits for someone who may sign, and what they lack. the same approval, for a person who may sign
G. The installation is read-only any step Without a valid licence a change is refused: "Not saved: this installation is read-only". Records can still be read, and packages can still be produced and downloaded. the same step, once the licence is active
H. The approval policy changes any time A person with the permission Manage project approval settings records a new revision (approval point Policy change). A proposal made under the earlier revision shows both revisions. the same step